The Meruelo Group

DOTY BROTHERS

SoCal Gas Company

PROJECT #3

Southern California Gas Company

This project is the relocation of approximately 1,500’ of 36” gas pipeline. The project was located on Benson Ave. overpass of the 60-freeway in Chino, CA. The existing pipeline was installed within the bridge casing and was planned to be installed by a horizontal directional bore (HDD) under the 60-freeway to limit the impact of the freeway. The project included coordinating with Caltrans, different cities and various property/commercial owners as the project progressed through the various stages (i.e., excavation, fabrication, boring under the freeway, installing the pipeline, backfilling, and final paving).

  • Location: Chino, CA
  • Timeline: January 2020 to July 2020
  • Construction Methods: Horizontal Directional Bore
  • Customer: Southern California Gas Company

SELECT ELECTRIC

San
Clemente

PROJECT #2

The San Clemente Project

The San Clemente project includes installing a complete new Traffic Signal system at Camino Vera Cruz & Costa, and a Traffic Signal Modification at Camino Vera Cruz & Calle Sarmentoso which includes new poles, and an upgraded cabinet modification. There are also 3 other existing locations that will have new Controller Cabinet modifications as well, installing the latest ITS Controllers, and new equipment with the latest communication technology to improve traffic flow.

These improvements generate a positive benefit for the community by improving drive times and create a safer environment for San Clemente drivers.

NEAL ELECTRIC

VA
Hospital

PROJECT #1

VA Hospital Project

This property is a hospital annex for Veterans Affairs that will be used in conjunction with the main La Jolla campus.

The new outpatient clinic will let the VA increase its primary care, mental health and specialty care services to veterans. 

 

 PROJECT FEATURES
+/-138,000 SF Hospital Annex

  • Existing cash vault for Bank of America that is to be repurposed
  • Building will be expanded from its current footprint to accommodate VA needs
  • Complete façade remodel of existing building
  • Building interior completely replaced including all infrastructure and upgraded to VA standards